Commercial Service Extension

SERVICE EXTENSION

A single phase or three phase service extension is dependent upon the size of service. 

For a commercial single phase - Oakdale Electric will determine the total footage then apply a cost per foot for any footage over 100 feet.  When additional charges are assessed, a Contribution in Aid to Construction will be paid in advance of construction. Single Phase Line Extension

For a small commercial three phase (50 kW Maximum) - Oakdale Electric will determine the total footage then apply a cost per foot for any footage over the last 100 feet.  When additional charges are assessed, a Contribution in Aid to Construction will be paid in advance of construction. Small Three Phase Line Extension Policy

For a large commercial three phase (51 – 300 kW) – Oakdale Electric will determine the total footage then apply a cost per foot for any footage over the last 1,000 feet, with no more than 100 feet into the premise.  When additional charges are assessed, a Contribution in Aid to Construction will be paid in advance of construction. Large Three Phase Line Extension Policy

  • If Aid to Construction has been collected, during the first 3 years from the date of connection and a new consumer connects to this same extension, the consumers will share in the cost and appropriate refunds will be made.
  • If a temporary service is required, it shall be limited to one year and there will be an annual charge of $300.00
  • The Cooperative reserves the right to make final determination as to the placement, location or routing of any line extension.
  • The Cooperative reserves the right to determine if a line shall be constructed overhead or underground or a combination of both.
  • OEC is not responsible for any damage due to unmarked or incorrectly marked private facilities.
  • The Cooperative reserves the right to assess additional charges for the line extensions which may include, but not limited to, right-of-way clearing, road bores, abnormal terrain, underground construction out of season, and permit fees.
  • The Cooperative reserves the right to waive any section of this line extension policy that otherwise might be applicable.